Analysis of Piles Performance in Soil and Settlement Able Mediums

Document Type : Research Paper

Authors

1 Assistant Professor, Department of Civil Engineering, Faculty of Engineering, Shahid Madani Azerbaijan University, Tabriz, Iran

2 M.Sc. of Geotechnical Engineering, Department of Civil Engineering, Faculty of Engineering, Shahid Madani Azerbaijan University, Tabriz, Iran

Abstract

The Tabriz city, as one of the metropolises of Iran, has a special geotechnical condition. In the northeastern part of Tabriz, due to the fine-grained soil layers and high groundwater level, a number of structures have been damaged. The Fereshteh town is one of the areas where in recent years unbalanced settlement of newly constructed buildings has been observed. With considering the importance of using pile-raft foundations, in this research by using the results of two boreholes in the Fereshteh area of Tabriz, the geotechnical characteristics of the soil have been evaluated. Subsequently, direct soil-structure interaction numerical models have been studied by Plaxis software. Based on the obtained results in this study, the minimum required length of piles in the pile-raft foundation system to change the status of the designation of structures from unauthorized to authorized, for 4 and 6-floor buildings is 6 meters and for the 8-story building is 8-meters. Also, in the 4, 6 and 8-floor buildings, respectively using 8, 10 and 12 meters for piles length is an optimal choice.

Keywords

Main Subjects


[1]- Mekbib, M., 2004, Performance of piled raft foundations for Addis Ababa soils, Thesis submitted for the degree of Doctor of Philosophy at the Addis Ababa University, Addis Ababa.
[2]- Muni, B., 2000, Soil mechanics and foundations, Wiley & Sons, New Jersey, United States of America.
[3]- Moyes, P., 2005, Piled raft design process for a high-rise building on the gold coast, Tall Buildings: From Engineering to Sustainability, 241-252.
[4]- Horikoshi, K., and Randolph, M. F., 1996, Centrifuge modelling of piled raft foundations on clay, Geotechnique, 46(4), 741-752.
[5]- El-Sawwaf, M., 2010, Experimental study of eccentrically loaded raft with connected and unconnected short piles, Journal of geotechnical and geoenvironmental engineering, 136(10), 1394-1402.
[6]- Matsumoto, T., Nemoto, H., Mikami, H., Yaegashi, K., Arai, T., and Kitiyodom, P., 2010, Load tests of piled raft models with different pile head connection conditions and their analyses, Soils and Foundations, 50(1), 63-81.
[7]- Fioravante, V., 2011, Load transfer from a raft to a pile with an interposed layer, Géotechnique, 61(2), 121.
[8]- Prakoso, W. A., and Kulhawy, F. H., 2001, Contribution to piled raft foundation design, Journal of Geotechnical and Geoenvironmental Engineering, 127(1), 17-24.
[9]- Wulandari, P.S. and Tjandra, D., 2015, Analysis of piled raft foundation on soft soil using PLAXIS 2D, Procedia Engineering, 363-367.
[10]- Poulos, H. G., and Davis, E. H., 1980, Pile foundation analysis and design, John Wiley & Sons, Inc., New York, N.Y.
[11]- احترامی، ع، ا.،1397، بررسی رفتار و اصلاح نشست‌ نامتقارن سازه‌های بتنی و پی‌های آن‌ها به روش جکینگ، پایان‌نامه کارشناسی ارشد، دانشگاه شهید مدنی آذربایجان، تبریز.
[12]- Sonmez, N., 2013, A Study on Design of Piled Raft foundation System, Middle East Technical University.
[13]- Randolph, M. F., 1994, Design methods for pile group and piled rafts, In Proc. 13th Int. Conference on SMFE, 5, 61-82.
[14]- Poulos, H. G., 2001, Piled raft foundations: design and applications, Geotechnique, 51(2), 95-114.
[15]- Coduto, D. P., 2001, Soil Mechanics. Foundation Design; Principles and Practices, 57-61.
[16]- Das, B. M., 2015, Principles of foundation engineering, Eighth edition, Cengage learning, Boston, United States of America.
[17]- Poulos, H. G., 1997, Comparison of some methods for analysis of piled rafts, In Proceedings of the international conference on soil mechanics and foundation engineering-international society for soil mechanics and foundation engineering.
[18]-Van Impe, W. F. and Clerq, L., 1995, A Piled Raft Interaction Model, Geotechnica, No.73, 1-23.
[19]- Burland, J. B., 1995, Piles as Settlement Reducers, Keynote Address, 18th Italian Congress on Soil Mechanics, Pavia, Italy.
[20]- Poulos, H. G., 1991, Analysis of Piled Strip Foundations, Comp. Methods & Advances in Geomechs., ed. Beer et al, Balkema, Rotterdam, 1: 183-191.
[21]- ملکی، م.، بائی، ب. و بیتی، م.،1389، بررسی تأثیر اندرکنش گودبرداری و سازه‌ی مجاور آن در تحلیل گودبرداری‌ها در محیط‌های شهری، نشریه مهندسی عمران دانشگاه فردوسی مشهد، دوره 21، شماره 2، ص25-40.
[22]- Potts, D. M., and Addenbrooke, T. I., 1997, A structure's influence on tunnelling-induced ground movements, In Proceedings of the Institution of Civil Engineers: Geotechnical Engineering, 125(2).
[23]- علیزاده مجدی، ع. و دبیری، ر.،1397، آسیب شناسی ژئوتکنیکی کوی فرشته تبریز، رویکردهای نوین در مهندسی عمران، دوره 2، شماره 1، ص 14-32.
[24]- رضایی، ا. ح؛ احترامی، ع. ا.،1397، رده بندی ریسک سازه‌های سطحی و بررسی عملکرد شمع درجا در کاهش نشست‌های ناشی از حفر تونل‌های مترو در مناطق شهری (مطالعه موردی مترو تبریز)، مهندسی زیر ساخت های حمل و نقل، سمنان، ایران.
[25]-Teo, P. L., and Wong, K. S., 2012, Application of the Hardening Soil model in deep excavation analysis, The IES Journal Part A: Civil & Structural Engineering, 5(3), 152-165.
[26]- مبحث 7 مقررات ملی ساختمان ایران، 1392، پی و پی‌سازی، دفتر امور مقررات ملی ساختمان وزارت راه و شهرسازی، نشر توسعه ایران، تهران، ایران.